↳ CAF WATCHER // CONTINUOUS PHYSICAL AUDIT LEDGER
Together AI (Open-Source Neocloud & Distributed Inference) Grade B+
Leading open-source AI acceleration platform, distributed training neocloud, and high-throughput serverless inference engine · Category: Specialized Neocloud & Clean Power
Executive Physical Feasibility & Delivery Audit
Institutional Baseline: Evaluated under the Compute Availability Factor (CAF v1.0) specification by Richie Adomako (Serpens Inc., ResearchGate ID 414150400). CAF evaluates stated accelerator capabilities against empirical physical reality (interconnection queues, electrical substations, liquid cooling heat transfer, and optical network fabrics). Missing public evidence is classified as unknown—it is never treated as zero capacity.
CAF INTERVAL
[0.33 – 0.58]
DELIVERY GAP SCORE
42 pts
OPERATING POWER
0.12 GW
vs 0.1 GW announced
EVIDENCE CONFIDENCE
MEDIUM (65%)
Physical Coupling Pillars (E, T, N, O)
-
Power & Grid Substrate (E = [object Object]): 80/100. Contracted ~220 MW active datacenter capacity, pioneering behind-the-meter clean energy partnerships with Crusoe Energy in North Dakota and geothermal compute in Iceland.
-
Thermal Dissipation & CDU Limits (T = [object Object]): 78/100. Mix of high-density air-cooled facilities and liquid-cooled GPU pods; Icelandic facility achieves PUE < 1.10 using natural sub-arctic free cooling.
-
Cluster Topology & Optical Fabric (N = [object Object]): 84/100. Pioneered FlashAttention and speculative decoding algorithms that minimize network communication during distributed inference.
-
Silicon & Operational Availability (O = [object Object]): 78/100. Maintains large multi-thousand fleet of Nvidia H100, A100, and L40S chips, actively expanding into AMD Instinct MI300X to reduce single-vendor exposure.
Attributable Public Evidence Ledger