↳ CAF WATCHER // CONTINUOUS PHYSICAL AUDIT LEDGER
SenseTime (SenseNova & Lingang AIDC) Grade B+
Asia's flagship artificial intelligence computing center: 300+ MW contiguous Lingang AIDC and SenseNova multimodal foundation models · Category: Asian AI Frontier
Executive Physical Feasibility & Delivery Audit
Institutional Baseline: Evaluated under the Compute Availability Factor (CAF v1.0) specification by Richie Adomako (Serpens Inc., ResearchGate ID 414150400). CAF evaluates stated accelerator capabilities against empirical physical reality (interconnection queues, electrical substations, liquid cooling heat transfer, and optical network fabrics). Missing public evidence is classified as unknown—it is never treated as zero capacity.
CAF INTERVAL
[0.33 – 0.59]
DELIVERY GAP SCORE
44 pts
OPERATING POWER
0.21 GW
vs 0.12 GW announced
EVIDENCE CONFIDENCE
MEDIUM (65%)
Physical Coupling Pillars (E, T, N, O)
-
Power & Grid Substrate (E = [object Object]): 82/100. Lingang AIDC benefits from Shanghai's high-reliability urban grid infrastructure with dedicated dual 220kV substation connections.
-
Thermal Dissipation & CDU Limits (T = [object Object]): 80/100. Engineered for PUE < 1.25 in humid coastal East China, utilizing variable-frequency magnetic levitation chillers and intelligent airflow management.
-
Cluster Topology & Optical Fabric (N = [object Object]): 84/100. Lingang facility was custom-engineered from the ground up for AI training, featuring high floor-loading capacity (16 kN/m²) and short optical fiber runs.
-
Silicon & Operational Availability (O = [object Object]): 66/100. Heavily impacted by trade sanctions; compensates by aggressively integrating domestic chips and optimizing software compilation for mixed silicon.
Attributable Public Evidence Ledger