↳ CAF WATCHER // CONTINUOUS PHYSICAL AUDIT LEDGER
PsiQuantum Grade B+
Utility-scale photonic quantum megaproject: building million-qubit cryogenic data centers with GlobalFoundries and sovereign states · Category: Quantum & Cryogenic Compute
Executive Physical Feasibility & Delivery Audit
Institutional Baseline: Evaluated under the Compute Availability Factor (CAF v1.0) specification by Richie Adomako (Serpens Inc., ResearchGate ID 414150400). CAF evaluates stated accelerator capabilities against empirical physical reality (interconnection queues, electrical substations, liquid cooling heat transfer, and optical network fabrics). Missing public evidence is classified as unknown—it is never treated as zero capacity.
CAF INTERVAL
[0.26 – 0.47]
DELIVERY GAP SCORE
48 pts
OPERATING POWER
0.05 GW
vs 0.1 GW announced
EVIDENCE CONFIDENCE
MEDIUM (65%)
Physical Coupling Pillars (E, T, N, O)
-
Power & Grid Substrate (E = [object Object]): 78/100. Partnered with the State of Illinois and ComEd to secure 60+ MW of heavy industrial power at the former US Steel South Works site on Lake Michigan.
-
Thermal Dissipation & CDU Limits (T = [object Object]): 82/100. Operates at 4 Kelvin (-452°F) rather than 15 millikelvin because photons generate less thermal excitation than superconducting qubits, simplifying refrigeration physics.
-
Cluster Topology & Optical Fabric (N = [object Object]): 80/100. Photons travel at the speed of light in glass fiber with virtually zero loss; qubits can be routed between cryogenic cabinets using standard telecom fiber cables.
-
Silicon & Operational Availability (O = [object Object]): 86/100. Manufactures all quantum photonic chips on standard 300mm wafer lines at GlobalFoundries Fab 8 in Malta, NY, leveraging Tier-1 semiconductor yields.