↳ CAF WATCHER // CONTINUOUS PHYSICAL AUDIT LEDGER
Poolside (Sovereign Code Foundation Models) Grade B+
European & US AI foundation laboratory pre-training specialized code models on execution graphs and building sovereign compute clusters in France · Category: Autonomous Agents & Applied AI
Executive Physical Feasibility & Delivery Audit
Institutional Baseline: Evaluated under the Compute Availability Factor (CAF v1.0) specification by Richie Adomako (Serpens Inc., ResearchGate ID 414150400). CAF evaluates stated accelerator capabilities against empirical physical reality (interconnection queues, electrical substations, liquid cooling heat transfer, and optical network fabrics). Missing public evidence is classified as unknown—it is never treated as zero capacity.
CAF INTERVAL
[0.27 – 0.49]
DELIVERY GAP SCORE
52 pts
OPERATING POWER
0.1 GW
vs 0.1 GW announced
EVIDENCE CONFIDENCE
LOW (38%)
Physical Coupling Pillars (E, T, N, O)
-
Power & Grid Substrate (E = [object Object]): 75/100. Anchored in France's 95% zero-carbon nuclear grid, securing ~180 MW contracted compute capacity with direct sovereign French industrial support.
-
Thermal Dissipation & CDU Limits (T = [object Object]): 74/100. European datacenters enforce strict PUE < 1.2 mandates, driving Poolside toward modern closed-loop chilled water and heat-recapture designs.
-
Cluster Topology & Optical Fabric (N = [object Object]): 82/100. High-speed InfiniBand fabric connecting tens of thousands of GPUs in Paris and Virginia, optimized for large-scale distributed reinforcement learning.
-
Silicon & Operational Availability (O = [object Object]): 75/100. Direct strategic partnership with Nvidia, ensuring early allocations of H100, H200, and upcoming B200 systems in European data halls.
Attributable Public Evidence Ledger