↳ CAF WATCHER // CONTINUOUS PHYSICAL AUDIT LEDGER
NEXTDC Grade B+
Oceania's sovereign AI hyperscale platform powering 500MW+ liquid-cooled GPU campuses · Category: Hardware & Physical Substrate
Executive Physical Feasibility & Delivery Audit
Institutional Baseline: Evaluated under the Compute Availability Factor (CAF v1.0) specification by Richie Adomako (Serpens Inc., ResearchGate ID 414150400). CAF evaluates stated accelerator capabilities against empirical physical reality (interconnection queues, electrical substations, liquid cooling heat transfer, and optical network fabrics). Missing public evidence is classified as unknown—it is never treated as zero capacity.
CAF INTERVAL
[0.28 – 0.51]
DELIVERY GAP SCORE
48 pts
OPERATING POWER
0.18 GW
vs 0.15 GW announced
EVIDENCE CONFIDENCE
MEDIUM (65%)
Physical Coupling Pillars (E, T, N, O)
-
Power & Grid Substrate (E = [object Object]): 78/100. Contracted 320 MW of energized high-voltage power across Sydney and Melbourne with long-term renewable PPAs.
-
Thermal Dissipation & CDU Limits (T = [object Object]): 80/100. Custom-engineered liquid loops (CDUs) deployed in M3 and S3 specifically designed for high-density Nvidia Blackwell and Hopper clusters.
-
Cluster Topology & Optical Fabric (N = [object Object]): 84/100. Terminus for the Southern Cross NEXT subsea cable, linking Sydney directly to Los Angeles in under 115ms.
-
Silicon & Operational Availability (O = [object Object]): 72/100. Hosts sovereign compute infrastructure for Australian federal defense, health, and enterprise foundation models.
Attributable Public Evidence Ledger