↳ CAF WATCHER // CONTINUOUS PHYSICAL AUDIT LEDGER
Microsoft AI / Azure Grade A
The world’s AI factory floor: massive global hyperscale infrastructure hosting OpenAI · Category: Hyperscale Cloud & Infrastructure
Executive Physical Feasibility & Delivery Audit
Institutional Baseline: Evaluated under the Compute Availability Factor (CAF v1.0) specification by Richie Adomako (Serpens Inc., ResearchGate ID 414150400). CAF evaluates stated accelerator capabilities against empirical physical reality (interconnection queues, electrical substations, liquid cooling heat transfer, and optical network fabrics). Missing public evidence is classified as unknown—it is never treated as zero capacity.
CAF INTERVAL
[0.41 – 0.71]
DELIVERY GAP SCORE
32 pts
OPERATING POWER
3.91 GW
vs 1.08 GW announced
EVIDENCE CONFIDENCE
HIGH (85%)
Physical Coupling Pillars (E, T, N, O)
-
Power & Grid Substrate (E = [object Object]): 89/100. Executed the historic 835 MW Three Mile Island nuclear PPA; leading the world in dedicated baseload nuclear contracts.
-
Thermal Dissipation & CDU Limits (T = [object Object]): 84/100. Developed proprietary custom cold-plates (Maia 100 sidekicks) and closed-loop chillers that eliminate municipal water evaporation.
-
Cluster Topology & Optical Fabric (N = [object Object]): 88/100. Engineered the supercomputers that trained GPT-3.5, GPT-4, and o1; mastered high-density InfiniBand networking.
-
Silicon & Operational Availability (O = [object Object]): 82/100. Deployed custom Maia 100 AI accelerator and Cobalt 100 CPU; largest single purchaser of Nvidia Blackwell systems.
Attributable Public Evidence Ledger