↳ CAF WATCHER // CONTINUOUS PHYSICAL AUDIT LEDGER
IBM Quantum (Quantum System Two) Grade A
The ultimate cryogenic building as computer: 15 millikelvin dilution refrigerators and hybrid quantum-HPC data centers · Category: Quantum & Cryogenic Compute
Executive Physical Feasibility & Delivery Audit
Institutional Baseline: Evaluated under the Compute Availability Factor (CAF v1.0) specification by Richie Adomako (Serpens Inc., ResearchGate ID 414150400). CAF evaluates stated accelerator capabilities against empirical physical reality (interconnection queues, electrical substations, liquid cooling heat transfer, and optical network fabrics). Missing public evidence is classified as unknown—it is never treated as zero capacity.
CAF INTERVAL
[0.57 – 0.91]
DELIVERY GAP SCORE
24 pts
OPERATING POWER
0.05 GW
vs 0.1 GW announced
EVIDENCE CONFIDENCE
MEDIUM (65%)
Physical Coupling Pillars (E, T, N, O)
-
Power & Grid Substrate (E = [object Object]): 92/100. While the quantum processor itself consumes negligible milliwatts, the external cryogenic pulse-tube compressors, microwave controllers, and classical error-correction servers draw ~25 kW per system.
-
Thermal Dissipation & CDU Limits (T = [object Object]): 96/100. Achieves 15 mK via a closed-cycle helium-3/helium-4 dilution process across 6 distinct temperature stages (50K, 3K, 800mK, 100mK, 15mK).
-
Cluster Topology & Optical Fabric (N = [object Object]): 93/100. System Two connects multiple cryogenic units together with cryogenic vacuum interconnect links, allowing quantum processors to communicate across cryostats.
-
Silicon & Operational Availability (O = [object Object]): 92/100. Heron uses multi-layer flip-chip bonding with superconducting through-silicon vias (TSVs) to route microwave lines from the back of the wafer, shielding qubits.
Attributable Public Evidence Ledger