↳ CAF WATCHER // CONTINUOUS PHYSICAL AUDIT LEDGER
Google DeepMind Grade A
End-to-end full-stack titan: silicon, datacenter buildings, undersea fiber, and research · Category: Hyperscale Cloud & Infrastructure
Executive Physical Feasibility & Delivery Audit
Institutional Baseline: Evaluated under the Compute Availability Factor (CAF v1.0) specification by Richie Adomako (Serpens Inc., ResearchGate ID 414150400). CAF evaluates stated accelerator capabilities against empirical physical reality (interconnection queues, electrical substations, liquid cooling heat transfer, and optical network fabrics). Missing public evidence is classified as unknown—it is never treated as zero capacity.
CAF INTERVAL
[0.48 – 0.81]
DELIVERY GAP SCORE
22 pts
OPERATING POWER
4.07 GW
vs 0.94 GW announced
EVIDENCE CONFIDENCE
HIGH (85%)
Physical Coupling Pillars (E, T, N, O)
-
Power & Grid Substrate (E = [object Object]): 91/100. Industry leader in 24/7 carbon-free energy contracts; signed landmark Kairos Power SMR deal and Fervo enhanced geothermal.
-
Thermal Dissipation & CDU Limits (T = [object Object]): 89/100. Pioneered AI-controlled datacenter cooling (reducing PUE to 1.10) with millions of embedded micro-sensors across facilities.
-
Cluster Topology & Optical Fabric (N = [object Object]): 92/100. Jupiter Optical Circuit Switches (OCS) dynamically route light beams using MEMS mirrors, eliminating electrical transceiver bottlenecks.
-
Silicon & Operational Availability (O = [object Object]): 86/100. Complete silicon sovereignty with 6 generations of TPUs; drastically lower cost per token than Nvidia-dependent peers.
Attributable Public Evidence Ledger