↳ CAF WATCHER // CONTINUOUS PHYSICAL AUDIT LEDGER
atNorth & Verne Global Grade A
Nordic & Icelandic zero-carbon geothermal and sub-arctic free-cooling AI supercomputing haven · Category: Nordic & Clean Energy Substrates
Executive Physical Feasibility & Delivery Audit
Institutional Baseline: Evaluated under the Compute Availability Factor (CAF v1.0) specification by Richie Adomako (Serpens Inc., ResearchGate ID 414150400). CAF evaluates stated accelerator capabilities against empirical physical reality (interconnection queues, electrical substations, liquid cooling heat transfer, and optical network fabrics). Missing public evidence is classified as unknown—it is never treated as zero capacity.
CAF INTERVAL
[0.38 – 0.65]
DELIVERY GAP SCORE
32 pts
OPERATING POWER
0.21 GW
vs 0.1 GW announced
EVIDENCE CONFIDENCE
MEDIUM (65%)
Physical Coupling Pillars (E, T, N, O)
-
Power & Grid Substrate (E = [object Object]): 92/100. Contracted 380 MW of verified renewable baseload with direct 220kV substation ties to Landsvirkjun geothermal stations.
-
Thermal Dissipation & CDU Limits (T = [object Object]): 90/100. Annual average ambient temperature of 4.5°C permits year-round direct free air economization and zero water evaporation.
-
Cluster Topology & Optical Fabric (N = [object Object]): 82/100. Heavy concrete single-story slab design built directly on basalt bedrock with 3,000 kg/m² floor loading.
-
Silicon & Operational Availability (O = [object Object]): 74/100. Pure play infrastructure substrate; customers import their own TSMC CoWoS allocations into leased white-space halls.
Attributable Public Evidence Ledger